| Latest Project |
| |
| > |
Remuera #1 Wastewater Pipeline CIPP |
|
| |
| |
| |
PipeWorks successfully completed a 900mm diameter, 306m long and 19.5mm thick CIPP liner into the Remuera #1 Wastewater pipeline for Watercare Services Limited, in April 2009. The impressive temporary wastewater bypass pipeline was installed prior to the lining operation and the temporary pumps installed were able to cope with a bypass rate of 216m3/s. During a rainstorm just prior to the installation the temporary system was tested almost to the limit, but it coped well with the load.
more >> |
|
 |
|
|
News and updates
|
| > |
CIPP Records broken by PipeWorks during 2009
PipeWorks successfully installed the longest shots ... more >> |
| > |
PipeWorks successfully completed a 900mm diameter, 306m long and 19.5mm thick CIPP liner ... more >> |
|
PipeWorks imports Horizontal Directional drill... more >> |
|
Horizontal Drill used at New Lynn Box Rail... more >> |
|
PipeWorks wins the 2008 Safety Award... more >> |