0800 100316
 
 
 
Projects
 
   Click headings to sort project items by that heading
 
 
Project Name Description Location
 
Remuera #1 Wastewater Pipeline CIPP PipeWorks successfully completed a 900mm diameter, 306m long and 19.5mm thick CIPP ... Auckland
 
 
Horizontal Directional Drilling required for New Lynn box rail project The New Lynn Rail Trench Project is a partnership between ONTRACK, Waitakere ... Waitakere City
 
 
Vector call on PipeWorks Horizontal Drill Telecoms services were not the only services that were required to be ... Waitakere City
 
 
Orewa Pond Rehabilitation Project As a partner in the Pond Management team with Watercare Services at ... Mangere
 
 
New water main required for Warkworth Township The Rodney District Council required the services of PipeWorks Vermeer Navigator II, ... Rodney District
 
 
Orakei Basin Sewer Separation Major excavations and manhole/structure installations were required to separate sewer and storm ... Orakei Basin
 
 
Hillsborough Wastewater Rehabilitation This project was undertaken as part of an infiltration and inflow study ... Auckland City
 
Page:
1 2 
News and updates

CIPP Records broken by PipeWorks during 2009 PipeWorks successfully installed the longest shots ... more >>

PipeWorks successfully completed a 900mm diameter, 306m long and 19.5mm thick CIPP liner ... more >>

 

PipeWorks imports Horizontal Directional drill... more >>

 

Horizontal Drill used at New Lynn Box Rail... more >>

 

PipeWorks wins the 2008 Safety Award... more >>

 

PipeWorks the 2007 Ingenium Excellence Awards... more >>

 

Environmental NZCF merit Award for PipeWorks... more >>

 
  All News Items >>
 
 
Contact
PipeWorks Ph: 0800 100316
18 Gabador Place or 09 5731901
P.O. Box 62077 Fx: 09 5731903
Mt Wellington  
Email: PipeWorks Customer Services
 
 
The Fletcher Construction Company Ltd trading as PipeWorks