PipeWorks successfully completed a 900mm diameter, 306m long and 19.5mm thick CIPP liner into the Remuera #1 Wastewater pipeline for Watercare Services Limited. The impressive temporary wastewater bypass pipeline was installed prior to the lining operation and the temporary pumps installed were able to cope with a bypass rate of 216m3/s. During a rainstorm just prior to the installation the temporary system was tested almost to the limit, but it coped well with the load.
News and updates
>
CIPP Records broken by PipeWorks during 2009
PipeWorks successfully installed the longest shots ... more >>
>
PipeWorks successfully completed a 900mm diameter, 306m long and 19.5mm thick CIPP liner ... more >>
PipeWorks imports Horizontal Directional drill... more >>
Horizontal Drill used at New Lynn Box Rail... more >>
PipeWorks successfully completed a 900mm diameter, 306m long and 19.5mm thick CIPP liner into the Remuera #1 Wastewater pipeline for Watercare Services Limited. The impressive temporary wastewater bypass pipeline was installed prior to the lining operation and the temporary pumps installed were able to cope with a bypass rate of 216m3/s. During a rainstorm just prior to the installation the temporary system was tested almost to the limit, but it coped well with the load.