Birkdale B Catchment Upgrade  The Project was centred on the horizontal directional drilled installation of 1,036 metres of gravity sewer.  The associated commissioning works included manhole installation and several shorter pipeline installations. View the video Setting New Standards When completed it >
Completed: Jun 2011
Location: Auckland
Service: Trenchless Pipe Construction
New Lynn Gas and Telecom HDD  These works were performed to enable the adjacent major New Lynn Rail Trench project. This larger job was being constructed by Fletcher Engineering, and they acted as Engineer for the HDD works. Drill and install a 150mm steel gas pipe supplied by Vector. Supply, drill and >
Completed: Apr 2008
Location: Auckland
Service: Trenchless Pipe Construction
Royal Road Whenuapai Branch Sewer HDD Siphon  The project involved installing a 710mm PE siphon next to the existing siphon under the Henderson Creek in West Auckland. The new pipe runs from Royal Road via Colwill Road to the Taipari Reserve on the other side.   Install 570m metres of 710mm PE pipe by directional >
Completed: Dec 2012
Location: Auckland
Service: Trenchless Pipe Construction
Snells Beach Wastewater Rising Main Upgrade  Horizontal Directional Drilling of two wastewater rising mains between Dawson Road and Goodall Road in Snells Beach near Warkworth. The work was performed mainly through open fields across private property. Supply and install by HDD methods of a 400mm diameter PE pipe 100m >
Completed: Jul 2008
Location: Warkworth
Service: Trenchless Pipe Construction
South Western Interceptor HDD portion  The Project was part of the larger South Western Interceptor Extension project; run as a JV between Fletcher Construction, Brian Perry Civil and PipeWorks.  PipeWorks were contracted to complete two Horizontal Directionally Drilled installations of a 1,000mm HDPE rising >
Completed: Aug 2011
Location: Auckland