Ardmore WTP Desludging and earthworks  The works involved dredging and desludging 3 ponds at the Ardmore Water Treatment Plant and then drying the sludge before placing it in an onsite landfill. The scope of work was to remove Alumina sludge from the Water Treatment Plant  from the bottom of the ponds and >
Completed: Feb 2013
Location: Auckland
Service: Remediation Works
Marine Parade Pump Station Upgrade  The works involved complete renewal of a wastewater pump station at the Marine Parade in Raglan. This is the last pump station on the pipeline before the local treatment plant, and the pipeline was required to stay in operation for the duration of the project Demolition of the >
Completed: Dec 2008
Location: Raglan
Service: Remediation Works
Orewa Oxidation Ponds 2 and 3 Desludging  This works involved desludging the #2nd and #3rd oxidation ponds in Silverdale. This work followed the previous desludging of the adjacent #1st pond. We were required to remove sludge from the bottom of the ponds and process it to a substance that was at least 20% solid. It >
Completed: May 2008
Location: Owera
Service: Remediation Works
Pukete Outfall Rehabilitation  This project involved installation of new joint seals to repair a deteriorated major wastewater outfall pipe that serves Hamilton City. The works were performed underwater within the Waikato River at the outfall location. Installation of an innovative new rubber seal type that >
Completed: Mar 2010
Location: Hamilton