Snells Beach Wastewater Rising Main Upgrade  Horizontal Directional Drilling of two wastewater rising mains between Dawson Road and Goodall Road in Snells Beach near Warkworth. The work was performed mainly through open fields across private property. Supply and install by HDD methods of a 400mm diameter PE pipe 100m >
Completed: Jul 2008
Location: Warkworth
Service: Trenchless Pipe Construction
Marine Parade Pump Station Upgrade  The works involved complete renewal of a wastewater pump station at the Marine Parade in Raglan. This is the last pump station on the pipeline before the local treatment plant, and the pipeline was required to stay in operation for the duration of the project Demolition of the >
Completed: Dec 2008
Location: Raglan
Service: Remediation Works
Orewa Oxidation Ponds 2 and 3 Desludging  This works involved desludging the #2nd and #3rd oxidation ponds in Silverdale. This work followed the previous desludging of the adjacent #1st pond. We were required to remove sludge from the bottom of the ponds and process it to a substance that was at least 20% solid. It >
Completed: May 2008
Location: Owera
Service: Remediation Works
Morrinsville Trunk Sewer Renewals  The contract was for lining of 1,150m of 600mm diameter wastewater pipe on the outskirts of Morrinsville in the Waikato. The section of pipe was downstream of two local high-end users; Fonterra and the local meat works. The worksite was mostly within agricultural fields and >
Completed: Sep 2009
Location: Morrinsville
Service: Trenchless Pipe Rehabilitation
Hawera Western Trunk Manhole Rehabilitation  This project involved upgrading 45 manholes in the Hawera Trunk Wastewater line by coating the walls and increasing the thickness by up to 15mm. Pipeworks managed the project, including our staff and a range of specialist subcontractors used. The first component of the works >
Completed: Jul 2008
Location: Hawera
Service: Remediation Works
Nelson Street Brick Arch Sewer Rehabilitation – Hastings NZ 2011  The project involved pipe renewal by Cured In Place Pipe (CIPP) structural liner. PipeWorks installed a liner along a 1.5km stretch of Nelson St, a critical arterial route within Hastings CBD. Over the manhole “wet out” technique was utilised for this project. Long >
Completed: Jun 2011
Location: Hastings
Service: Trenchless Pipe Rehabilitation