Remediation Works
Environmental Rehabilitation

Restoration and rehabilitation of oxidation ponds and natural reserves

PipeWorks owns a dredge and a centrifuge suitable for sludge removal from WWTP ponds and similar structures. The dredge was originally built by Fletcher Construction to be used on their Mangere project. Fletcher rebuilt the Mangere Waste Water Treatment Plant and removed most of the original oxidation ponds as part of this contract. Since then PipeWorks have used their equipment with considerable success on a number of projects.

Reserve Rehabilitation

PipeWorks is often involved with the environmental and associated pipeline rehabilitation of reserves as part of pipeline rehabilitation and/or trenchless pipeline construction projects and more recently at the Goodall Reserve for MetroWater, a standalone environmental rehabilitation project. 

Click images to enlarge

Downloads

Currently no related downloads for this service